The small narrow driveway and the gates were removed and the driveway was extended in width and length. The boundary wall was rebuild to accommodate the heavy metal gates. Reclaimed blue bricks were used to match the existing brick wall and reclaimed stones were used to match the existing stone to its perfection. The landscaping work was also carried out by our company.
You can see all the work carried out in the pictures and video clips.
A wet/shower room was built and the room was plastered and wired. This had to be disable
friendly so a seat was made in the wet room directly under the shower. The floor and walls were
tiled using mosaic tiling.
You can see all the work carried out in the pictures and video clips.
A wet/shower room was built and the room was plastered and wired. This had to be disable
friendly so a seat was made in the wet room directly under the shower. The floor and walls were
tiled using mosaic tiling.
You can see all the work carried out in the pictures and video clips.
A wet/shower room was built and the room was plastered and wired. This had to be disable
friendly so a seat was made in the wet room directly under the shower. The floor and walls were
tiled using mosaic tiling.
You can see all the work carried out in the pictures and video clips.
The old kitchen was stripped and extension was added to create more space. Kitchen was then
plastered and tiled from the floors to the walls. New kitchen units were fitted with granite
including the Island.
You can see all the work carried out in the pictures and video clips.